Mill Shells / Orientale Province, Democratic Republic of Congo 1,612 Km
Mining Sector
Project Overview
TransEast was tasked with deliveringof Mill Shells from .
The operation required advanced route planning, compliance with reg
Scope of Work
•Trailer Configuration:Establish appropriate trailer setup in compliance withKENHA(Kenya National Highways Authority) andUNRA(Uganda National Roads Authority) standards.
•Route Survey
oBridge load calculations
oDiversion planning
oSteering radius and stability analysis
•Risk Management:Perform risk analysis and document daily toolbox talks.
•Load Handling:Positionload direct ex hook&lash
•RegulatoryPermits:Ensure regulatory permitswhe nyaNational Highway Authorit)&UNRA (Uganda National Roads Authority)
•Escort
Cargo Specifications
•Mass:48 metric tons
•Width:5.9 m
•Height:3.8 m
Equipment Utilized
•Prime Mover:Mercedes-Benz Actros 3348
•TrailerType